Originally opened in 1973, the theatre underwent a revamp and external facelift with the installation of overlapping shingles in the Rimex 316 Champagne Pegasus finish. Around 1800 m2 of product was used with the majority installed as shingles in 0.8mm thickness and a smaller quantity in 1.5mm installed in other areas around the wider project.
Product used: 316 Champagne Pegasus.